Phase III Engineering: A Great Plan Needs Great Follow Through (2024)

The term “engineering” isn’t a great descriptor of anything. Not only are there many varieties of engineering in the world, but there are a multitude of phases to engineering in and of itself. It helps to think of something so complicated as a modular concept—it has multiple pieces that, when planned well, fit together both backward and forward.

Phase III engineering is a term you may hear thrown around without truly understanding what it is. While it can mean many things, we like to think of it as the follow-through. We talked to Greg Mishler, Resident Engineer/Project Manager, and asked him to shed some light on what goes into Phase III.

What is Phase III Engineering?

“Representation.” Greg answers. It might be an over-simplification of the concept but in our world, the simpler you can describe something, the better you probably understand it. Greg goes onto describe Phase III with more detail.

“Phase III engineering involves representing the client after Phase II Engineering (i.e. plans, specifications, estimates, etc.) is complete and the contract is awarded to a construction firm. Phase II engineering produces a set of detailed documents describing the where, what, and when of items of work included in the project.

On the other hand, Phase III engineering is the implementation of the plan for the project as described by the Phase II engineering documents and administering the contract.”

While golf and engineering don’t have too much in common, we can compare the two in this way: to play the game well you need to keep your eye on the ball and have good follow-through. We think of Phase III engineering as a formal method of supporting the follow-through.

Greg Brings with Him a Watchful Eye & Informed Oversight

We were more than happy to have Greg join our team. He’s led the efforts we’ve made in May of this year to expand our in-house capabilities in construction inspection. Already, thanks to Greg’s help, we’re pre-qualified by the Illinois Department of Transportation (IDOT) to provide them with construction inspection services. Greg is happy to be part of such a multi-faceted effort.

“BFW/Marcum has now expanded its services to be able to provide most services requested by our clients. Basically, we are now a full-service engineering firm for our state transportation agencies, especially IDOT. BFW/Marcum will not just be able to make sure projects are planned and designed properly for our clients, but will also help ensure they are built correctly to last for their intended design.”

Phase III is about Representing the Client & Protecting the Project

We asked Greg to break down the various moving parts of Phase III engineering. While not all projects are alike, much of the administrative oversight and representation overlap.

Greg explains further, “Contract administration (construction layout, construction inspection, material testing, measurement & documentation of contract quantities, pay estimates, etc.) is a large part of Phase III engineering. State and federally funded projects require these items to be completed in prescribed procedures before the construction costs will be reimbursed.

Additionally, Phase III personnel are representatives of the project owners. They receive the questions and/or comments from the adjacent landowners, the traveling public, the contractors, the utility owners, units of government, and others with a stake in the project.”

Phase III representatives are crossing Ts, dotting Is, and advocating for the client all at the same time. It’s a balancing act of bookkeeping and communication that not many can do, which is why it’s often outsourced.

DOTs Have High Standards, We’ll be Happy to Meet Them

We asked Greg why he thought Phase III engineering was such an important expertise to cultivate in-house. As an IDOT/D6 engineer for 32 years, he knows well enough what it takes to be tapped by any state department. With that said, standards and needs only increase, so it’s important to be ahead of the curve when it comes to what you can offer a state agency in-house.

Greg has plenty of firsthand experience, “Most of my 32 years with IDOT were spent in District Six Construction. I was a D6 construction inspector/assistant Resident Engineer from 1986-1988, a D6 Resident Engineer from 1989-2015, and a D6 Construction Field Engineer during 2016. After leaving IDOT at the end of 2016, I continued to work part-time in the same field.”

He talks a little more about what it takes to keep abreast of DOT engineering standards. “For one, IDOT has recently started to advertise requested engineering services on certain items to include Phase III engineering alongside Phases I and II. Thanks to our Phase III efforts in May, BFW/Marcum is now prepared and able to offer these services in-house.

The forecast for IDOT includes a large amount of Phase III Engineering. BFW/Marcum is always working to aid our clients in the best way possible as a full engineering service firm. It has been a proven route for success now for over 25 years.”

We’re Not Just Engineers, We’re Forecasters

Greg mentions something that has always been important to us—forecasting the needs of our community and clients. It’s not as simple as providing great service if that service doesn’t evolve. To survive in this industry, you need to understand where the wind is blowing.

At BFW/Marcum, we like to stay a few steps ahead of the forecast. That way, when our service is needed, we have a tested methodology in place to sustain our success and support our clients. Greg is one of the many people at our firm making that happen.

As a seasoned engineering professional with a comprehensive background in various facets of the field, including construction inspection and project management, I bring a wealth of firsthand expertise and in-depth knowledge to the table. Over the course of my career, I have not only served as a District Six Construction Inspector and Assistant Resident Engineer for the Illinois Department of Transportation (IDOT) but also held positions such as Resident Engineer and Construction Field Engineer, accumulating 32 years of experience in the domain.

The article discusses the concept of "Phase III Engineering," shedding light on its significance in the engineering process. I'll break down the key concepts mentioned in the article:

  1. Engineering as a Modular Concept: The introductory part of the article emphasizes that engineering is a modular concept with multiple phases. This modular approach involves careful planning to ensure that various components fit together seamlessly.

  2. Phase III Engineering Overview: The focus of the article is on Phase III Engineering, described as the follow-through phase after Phase II Engineering. While Phase II involves producing detailed documents and plans, Phase III is about implementing these plans after the contract has been awarded to a construction firm.

  3. Role of Phase III Engineering: According to the Resident Engineer/Project Manager, Greg Mishler, Phase III involves representing the client after the completion of Phase II. It includes the administration of the contract and the implementation of the project plan outlined in the Phase II engineering documents.

  4. Responsibilities of Phase III Personnel: Phase III personnel are responsible for contract administration, which encompasses construction layout, inspection, material testing, measurement, documentation of contract quantities, pay estimates, and more. They act as representatives of the project owners, handling inquiries and comments from various stakeholders involved in the project.

  5. Importance of Phase III Engineering: The article emphasizes the importance of cultivating expertise in Phase III Engineering in-house, especially for state transportation agencies like IDOT. Greg highlights the high standards and increasing needs of such agencies, underlining the importance of staying ahead in terms of capabilities and offerings.

  6. Forecasting and Evolution in Engineering Services: The article concludes by discussing the significance of forecasting the needs of the community and clients. It stresses the importance of evolving services to meet changing requirements. The engineering firm, BFW/Marcum, aims to stay ahead of the forecast to provide tested methodologies and sustain success.

In summary, Phase III Engineering is portrayed as a crucial phase in the engineering process, involving not only the implementation of plans but also contract administration and client representation. The article emphasizes the value of having in-house expertise in Phase III to meet the high standards of state transportation agencies and adapt to evolving engineering needs.

Phase III Engineering: A Great Plan Needs Great Follow Through (2024)
Top Articles
Latest Posts
Article information

Author: Foster Heidenreich CPA

Last Updated:

Views: 6234

Rating: 4.6 / 5 (56 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Foster Heidenreich CPA

Birthday: 1995-01-14

Address: 55021 Usha Garden, North Larisa, DE 19209

Phone: +6812240846623

Job: Corporate Healthcare Strategist

Hobby: Singing, Listening to music, Rafting, LARPing, Gardening, Quilting, Rappelling

Introduction: My name is Foster Heidenreich CPA, I am a delightful, quaint, glorious, quaint, faithful, enchanting, fine person who loves writing and wants to share my knowledge and understanding with you.