Lot Sizing - Material Planning (2024)

Lot Sizing

Base on the requirements of product, MRP refers to the net requirements of parts or materials. But these requirements without any change may be unsuitable for placing an order or manufacturing. Lot sizing is to unify the calculated net requirements by a certain unit considering cost reduction and work efficiency.

Lot Sizing - Material Planning (1)There are two main types of lot sizing: a method to unify in terms of the period and another method to unify in terms of the quantity. The former includes "Fixed Period Requirements", which, generally speaking, is suitable for the relatively expensive items whose demand occurs irregularly. The latter includes "Fixed Period Requirements" or "Economic Lot Sizing", which is suitable for items whose demand is relatively stable. In addition to these types, there are any other types of lot sizing as shown in the figure.

Related term: MRP

Lot Sizing - Material Planning (2024)
Top Articles
Latest Posts
Article information

Author: Chrissy Homenick

Last Updated:

Views: 5444

Rating: 4.3 / 5 (74 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Chrissy Homenick

Birthday: 2001-10-22

Address: 611 Kuhn Oval, Feltonbury, NY 02783-3818

Phone: +96619177651654

Job: Mining Representative

Hobby: amateur radio, Sculling, Knife making, Gardening, Watching movies, Gunsmithing, Video gaming

Introduction: My name is Chrissy Homenick, I am a tender, funny, determined, tender, glorious, fancy, enthusiastic person who loves writing and wants to share my knowledge and understanding with you.