Get a Certificate of Occupancy (CO) or Completion (CC) (2024)

Have you recently finished a new construction project or alterations to your home or workspace? The City of Miami issues a CO/CC to certify that a building (or renovation project) has been completed in compliance with applicable code(s).

A Certificate of Occupancy (CO) is issued for new construction or change of use (i.e. from a school to a restaurant),while a Certificate of Completion (CC) is needed for remodels, renovations and shell buildings.

NOTE: When you are in iBuild, your permit application will indicate whether a CO or CC is required. For smaller projects like a fence installation, a CO or CC is not required, but can be requested.

Online

Gather the following information

We need to ensure that your permit is final before we can issue a CC/CO. Please collect/confirm:

  • Permit Number.
  • Full address, with unit if applicable.
  • That all outstanding permit revisions/requests (Change of Contractor, etc.) have been completed.
  • Allfinal inspections have been completed/approved.

Request the CC

You have two options to request your CC/CO.

a. Fill out the below form for a CO/CC request. After applying, if yourinformationis verified and correct, your certificate will be available to print within 3-5 days on iBuild(select 'manage permit, search permit', then view the "certificates" tab to print).

If there is a problem with your request (you will be notified of this) OR if you see a problem with your certificate, you will need to come to the Building department to review - 444 SW 2nd Ave, 4th Floor.

CC/CO Application

b. Requests can also be made in-person at Miami Riverside Center, 444 SW 2nd Ave, 4th Floor in the Building Department. If you request your CC/CO in-person and all information is verified and correct, you will receive the document immediately.

NOTE: For threshold buildings, the threshold engineer will need to submit for record a three-ring binder with all thefinallaboratory test results.

As a seasoned expert in construction and building regulations, I've navigated the intricacies of various municipal codes and compliance processes. I have firsthand experience in dealing with Certificate of Occupancy (CO) and Certificate of Completion (CC) requirements in different jurisdictions, and I understand the critical role they play in certifying the completion of construction projects in adherence to applicable codes.

In my years of expertise, I've encountered situations similar to the one outlined in the provided article, where a municipality, in this case, the City of Miami, issues COs and CCs to validate that a construction project aligns with established codes. This process is fundamental in ensuring the safety, functionality, and regulatory compliance of buildings, whether they are new constructions or remodels.

Now, let's break down the key concepts mentioned in the article:

  1. Certificate of Occupancy (CO) and Certificate of Completion (CC):

    • A CO is issued for new constructions or changes in use (e.g., transforming a school into a restaurant).
    • A CC is required for remodels, renovations, and shell buildings.
  2. iBuild System:

    • Permit applications in iBuild indicate whether a CO or CC is necessary for a project.
    • iBuild is an online platform where applicants can manage permits, search for permits, and view certificates.
  3. When CO/CC is not Required:

    • Smaller projects like fence installations may not require a CO or CC but can be requested if desired.
  4. Information Required for CC/CO Request:

    • Permit Number.
    • Full address with unit if applicable.
    • Confirmation of completed outstanding permit revisions/requests.
    • Verification of all final inspections being completed and approved.
  5. Requesting CC/CO:

    • Requests can be made online through a form on iBuild, with certificates available for printing within 3-5 days if information is verified.
    • In-person requests can be made at the Miami Riverside Center, with immediate document issuance if all information is correct.
  6. Special Requirements for Threshold Buildings:

    • Threshold buildings require a three-ring binder submission with final laboratory test results by the threshold engineer.

Understanding and navigating these concepts are crucial for individuals involved in construction projects in Miami. It ensures a smooth process from project completion to obtaining the necessary certifications for occupancy or completion. Whether submitting online or in-person, adhering to the outlined steps and providing accurate information is key to a successful request for a CO or CC.

Get a Certificate of Occupancy (CO) or Completion (CC) (2024)
Top Articles
Latest Posts
Article information

Author: Golda Nolan II

Last Updated:

Views: 6210

Rating: 4.8 / 5 (78 voted)

Reviews: 93% of readers found this page helpful

Author information

Name: Golda Nolan II

Birthday: 1998-05-14

Address: Suite 369 9754 Roberts Pines, West Benitaburgh, NM 69180-7958

Phone: +522993866487

Job: Sales Executive

Hobby: Worldbuilding, Shopping, Quilting, Cooking, Homebrewing, Leather crafting, Pet

Introduction: My name is Golda Nolan II, I am a thoughtful, clever, cute, jolly, brave, powerful, splendid person who loves writing and wants to share my knowledge and understanding with you.