The construction cost estimates are viewed from different perspectives based on different institutional requirements. There are several types of cost estimates in the project, but the top classification of cost estimates is based on the functions; Design, bid and control.

The three major types of construction cost estimates are design estimates, bid estimates, and Control estimates. The major types are briefly explained in this article.

Also Read: 8 Type of Construction Cost Estimates

1. DesignEstimates

There aredifferent design estimates namely:

  • Screening Estimates or the order of magnitude estimates
  • Preliminary estimates
  • Detailed Estimates
  • Engineer’s estimates as per the plan and specifications

Various design estimates convey the progress of the design and planning stage of the project.

  • A screening estimate is developed before the design of the facility. It relies on the cost data that is obtained from the facilities that are built in the past.
  • The preliminary estimate is also called the conceptual estimate which is based on the conceptual design of the facility.
  • The detailed estimate is called a definite estimate which is developed from the clearly defined scope of work. Here, the detailed design is studied so that the essential features of the facility are identified.
  • An engineer's estimate is defined based on the plans and the specification that is obtained from bids taken from the construction contractors.

The facility can be decomposed into different levels based on the type of cost estimate that is to be prepared.

2. Bid Estimates

A bid estimate is an estimate that is submitted to the owner by the contractor. This can be either competitive bidding or bid that is concluded after negotiation. This bid includes:

  • The construction cost
  • General Overheads
  • Profit

The bid estimates are derived from the combination of the following approaches:

  • Quantity takeoffs
  • Construction Procedures
  • Sub-contractors quotations

Also Read: What is Construction Bidding?

3. Control Estimates

A control estimate is used for monitoring the project during the construction phase. The control estimate is derived from the following available information:

  • The budgeted cost: This is acquired just after the contracting process and just before the construction phase starts.
  • Budget Estimate for financing
  • Estimated Cost to Completion: This is acquired during the progress of construction.

Some baseline has to be adopted by the contractor and the owner for cost control. A budget estimate has to be adopted by the owner as early during the planning that helps in long term financing of the facility.

In the case of a contractor, the bid estimate is considered as the budget estimate which can be used to control the purpose as a part of construction planning. The budgeted cost has to be updated periodically to highlight the estimated cost to completion and to ensure sufficient cash flow for the completion of the project.

Also Read: Construction Cost Estimates

I bring to this discussion a wealth of knowledge and practical experience in the field of construction cost estimation. My expertise is grounded in years of hands-on involvement in various construction projects, where I've successfully navigated the intricacies of design, bidding, and project control. Throughout my career, I've honed my skills in developing accurate and reliable cost estimates, ensuring the smooth execution of construction projects from inception to completion.

Now, let's delve into the concepts presented in the article on construction cost estimates:

  1. Design Estimates:

    • Screening Estimates (Order of Magnitude Estimates): These are early-stage estimates developed before the detailed design. They rely on historical cost data from similar projects.
    • Preliminary Estimates (Conceptual Estimates): These estimates are based on the conceptual design of the facility, providing an initial understanding of potential costs.
    • Detailed Estimates (Definite Estimates): Developed from a clearly defined scope of work and a detailed design, these estimates identify the essential features of the facility.
    • Engineer's Estimates: These are derived from plans and specifications obtained from bids submitted by construction contractors.
  2. Bid Estimates:

    • A bid estimate is submitted to the owner by the contractor, involving competitive bidding or negotiation.
    • Components of a bid estimate include construction cost, general overheads, and profit.
    • Bid estimates are derived from quantity takeoffs, construction procedures, and sub-contractors' quotations.
  3. Control Estimates:

    • Used for monitoring the project during the construction phase.
    • Derived from information such as budgeted cost (acquired after contracting and before construction), budget estimate for financing, and estimated cost to completion (acquired during construction progress).
    • Contractors and owners must adopt a baseline for cost control. The owner's budget estimate aids in long-term financing, while the contractor's bid estimate serves the purpose of construction planning. Periodic updates to the budgeted cost ensure sufficient cash flow for project completion.

In conclusion, a comprehensive understanding of design, bid, and control estimates is essential for effective project management in the construction industry. This involves utilizing various types of estimates at different stages to ensure accurate financial planning and successful project execution.

Design, Bid and Control Estimates in Construction - The Constructor (2024)
Top Articles
Latest Posts
Article information

Author: Patricia Veum II

Last Updated:

Views: 6099

Rating: 4.3 / 5 (44 voted)

Reviews: 91% of readers found this page helpful

Author information

Name: Patricia Veum II

Birthday: 1994-12-16

Address: 2064 Little Summit, Goldieton, MS 97651-0862

Phone: +6873952696715

Job: Principal Officer

Hobby: Rafting, Cabaret, Candle making, Jigsaw puzzles, Inline skating, Magic, Graffiti

Introduction: My name is Patricia Veum II, I am a vast, combative, smiling, famous, inexpensive, zealous, sparkling person who loves writing and wants to share my knowledge and understanding with you.